Buildlogue #20 – Roofing

Friday 25 July 2014 Construction Day 26, marks seven months since we touched down at Wellington airport at the close of Xmas at midnight on 25 December 2013.

aa1
(Above): The view of the roof above the bedroom – the plywood sheets being fitted to the first half of this area.

aa2
(Above): Fitting the supports for the metal roofing along the western side of the bedroom above the opening French Doors.

aa3
(Above): The view of the bedroom from the sitting room. On the right, just beyond the orange broom, is the bathroom door and a bit past that, the dressing room/ walk-in wardrobe door. On the left next to the panel of plywood, is the opening for the French Doors.

a11
(Above): A view of the ply-clad “flat roof” area nearing completion as seen from Tyler’s upstairs bedroom window, and (below) as seen from the ground floor standing in the bathroom-to-be.

a13

a12
(Above): The framework stands bathed in bright afternoon sunshine, in preparation of a scheduled inspection by KCDC next week. Possibly the sunlight is a promise of better weather to come?

Once we have passed the upcoming inspection, cladding of the open skeleton can commence and the building will start taking on a proper character of its own… 